How a container line schedule is built, and why it slips
A weekly string looks like a timetable. It is a negotiated path through ports, alliances and windows that can move without the ship being late in any simple sense.
A container service is usually advertised as a rotation: a named string of ports, a planned weekday at each one, and a promised transit time between them. Behind that is a slot of berth time bought or allocated at each port, a set of connections to other strings in the same alliance, and a fuel and canal plan that only works if the ship arrives inside a window.
Reliability is not the same as speed
A ship can leave a day late and still be "on schedule" if the published window was always a range, or if the line has already retimed the string. The figure that matters to a shipper is schedule reliability: the share of arrivals that fall inside the advertised window. Average transit time can look stable while reliability collapses, because delays at one port are absorbed by cutting time at the next, or by skipping a call altogether.
Blank sailings, rolled cargo and omitted ports are the ordinary tools for this, not emergency measures. They are how a line protects later windows when an earlier one has already been missed.
Alliances hide the operator you think you booked
A booking may be confirmed by one company and carried on a vessel operated by another, under an alliance or a vessel-sharing agreement. The bill of lading still names the contractual carrier. The operational questions -- which crane window, which feeder, which terminal -- belong to whoever is running that call. When something goes wrong, the useful first question is who controls the berth, not whose logo was on the quotation.
The practical test
Ask for the current rotation, the reliability figure for the last quarter, and whether the booking is on a vessel the line itself operates. If the answer is only a transit time, you do not yet have a schedule.